McCormack Construction has completed the Behavioral Health Management (BHM) Improvements for New Directions Northwest, a return client who first worked with McCormack on its 2020 treatment facility in Baker City, Oregon. The BHM facility provides residential recovery services, and the work expands the space it has to serve clients.
The project combined a 5,080-square-foot remodel of the existing building with a new 2,878-square-foot addition. The remodel repurposed existing office space into new offices and client sleeping rooms. The addition was built with conventional wood stud framed walls, a concrete slab on grade and wood trusses.
McCormack delivered the work as CM/GC, providing estimating, value engineering and general contracting. It was carried out together with the Recovery Village Center addition for the same owner, as one program of two new wood-framed buildings and interior improvements at BHM.
We appreciate the hard work and dedication of everyone involved in bringing this project to completion.