The challenge
Remote site logistics, inadequate soils requiring over‑excavation and replacement, and the need for dependable power and communications.
What we did
McCormack set up temporary power and Starlink connectivity, completed full over‑excavation and engineered backfill, and maintained disciplined scheduling and documentation for custom materials and decisions.
The result
The project is nearing final completion, expected at the end of November 2026. Duane Henry, Ashley Henry, Ben Henry and Tyler Ball have been pivotal in closing out the job efficiently while maintaining a high level of quality, demonstrating McCormack’s capability in complex, remote residential work.