McCormack Construction has completed a new addition to the Recovery Village Center for New Directions Northwest, a return client who first worked with McCormack on its 2020 treatment facility in Baker City, Oregon. The Recovery Village Center is a residential recovery center.
The project added 1,079 square feet to the existing facility, built with conventional wood stud framed walls, wood floor joists and wood trusses. A new exterior door was also installed at the existing building. The photos follow the work from open framing through drywall to finished rooms and the completed exterior.
McCormack delivered the work as CM/GC, providing estimating, value engineering and general contracting, together with the Behavioral Health Management (BHM) Improvements for the same owner.
We appreciate the hard work and dedication of everyone involved in bringing this project to completion.